John Jay College of Criminal Justice
WDFs HVAC division will install 3750 tons chilled water cooling plant (three 1250 ton chillers), free cooling heat exchanger. We will install a reheat water system for lab floors and provide perimeter heating system; construct all duct work distribution, and build fire protection system/sprinkler and standpipe for the building.
This is a DASNY project with Turner Construction as general contractor.